CLASSIFY INTO RISK CATEGORY: By calculating the hazard score it is then possible to classify it into the correct risk score category and thereby determining which possible urgent plan of action is to be taken.
| Risk score(R) | Inerpretation | Priority for the measuresto be taken | | <20 | Very limited risk - acceptable | 4 | | 20 to 70 | Measures required (in 6m) | 3 | | 70 to 200 | Immediate measure required | 2 | | > 200 | Stop work until measures taken | 1 |
Only R<20 can result in an acceptable situation where nothing (additional) needs to be done. However as long as S >= 4 additional measure are strongly recommended. |